text size   

Making corrections to facility claims

To make a correction to a previously submitted facility claim, resubmit it with the appropriate bill type, changing the frequency (third digit of the bill type, see below) to reflect the change.

Accepted bill frequencies are:

1 – Admit through discharge claim
2 – Interim – first claim
3 – Interim – continuing claim
4 – Interim – last claim
5 – Late charges only claim
7 – Replacement of a prior claim
8 – Void/cancel a prior claim
Last modified: 6/21/2011
Life just got a little easier

You need to install a Flash plugin to see this video.